Hi,
I know this has been asked and discussed multiple times, but I'm getting more and more confused by the minute.
From what I read between here and the official KBs I understood the following;
No outlet groups - Connected devices get shutdown either by PCNS on battery event (with delay) or by the maximum required delay setting from the NMC shutdown configuration.
Outlet groups - Connected devices get shutdown either by PCNS on battery event (with delay) or by Power off delay setting on the outlet group configuration.
Now what I'm struggling to understand: With outlet groups, what's the point of the "maximum required delay" setting if it is not taken into account and how can we configure a server to get a shutdown triggered based on left over power?
Thanks in advance.