Firstly, long time reader, first time poster :D
I have been struggling to comprehend exactly how to setup IPM and IPP.
Whether my head is full of rocks, or the information is not displayed how I can understand I'm not sure yet. haha. But I've spent the last 48h trying to figure things.
I have setup many Eaton before, 5P(X) mainly, and setup a simple IPP if needed. (I've also been confused about when to choose IPP or IPM tbh.)
Now I'm attempting to setup a system more complex and I'm struggling, and I'm not sure if it's cos we need a gold licence, or I'm just doing it wrong.
I have 2 Eaton UPS (5PX 2000 and 5PX 3000, both via USB to a management server) powering 2 MS HyperV core servers, plus a few other physical servers and rack equipment (QNAP NAS, router, switches, etc).
Now, so far, I've managed to get both UPS into a redundant mode as...